Large Scale Scrum (LeSS)基本上是演化 Scrum, 把它應用到多團隊的狀況中
因此 LeSS 和 Scrum 是需要成隊演進和配合的
目前Scrum Guide 中對 團隊結構 和 產品層級的想法, 和 LeSS 不同
因此為了能搭配 LeSS 的理念和設計, Bas and Craig 修改了一版新的 Scrum Guide
https://less.works/less/scrum-guide

修改後的 Scrum Guide 版本, 和目前 Scrum Guide 2020 有著以下較大的差異
- Re-introduced product instead of “work for complex problem.”
- Removed the Scrum Team concept.
- Renamed Developers to Team.
- Removed Sprint out of Events and made it a separate thing.
- Renamed Product Goal to Product Vision.
- Removed “creating and communicating Product Backlog Items” from Backlog Management in the Product Owner section.
- Removed Topic 1/2/3 terminology and just called it why/what/how.
- Added Product Backlog Refinement to the Scrum Events, yet mentioned that it can be done as an activity rather than an event.
- Removed the language of commitment to artifacts.
- Moved Sprint Goal in one place, inside Sprint Planning.
- Introduced Definition of Done, not as commitment but as an agreement.